Old Settler Wind Farm

USA / Texas / Floydada /
 wind farm  Add category
 Upload a photo

Old Settler Wind Farm is located about 4-15 miles east and up to 5 miles north of Floydada, Texas. Commissioned in 2017, it consists of 63 GE Energy 2.4-107 with a combined nominal capacity of 151.2 MW.
Note that some of the turbines that are situated within the above limits actually belong to the Cotton Plains wind farm.
Nearby cities:
Coordinates:   34°1'31"N   101°9'19"W
This article was last modified 7 years ago