Sweetwater 3 Wind Farm
USA /
Texas /
Sweetwater /
World
/ USA
/ Texas
/ Sweetwater
wind farm
Add category
Sweetwater 3 Wind Farm, phase 3 of the 'Sweetwater' wind farms, is located about 2-5 miles northeast and 7 miles north of the village of Maryneal, which is about 15 miles south of Sweetwater, Texas. Commissioned in 2005, it consists of 90 GE Energy 1.5sle wind turbines with a combined nominal capacity of 135 MW.
Wikipedia article: https://en.wikipedia.org/wiki/Sweetwater_Wind_Farm
Nearby cities:
Coordinates: 32°18'57"N 100°26'12"W
- Horse Hollow II Wind Energy Center 20 km
- Capricorn Ridge Wind Farm 65 km
- Broadview Wind Farm 379 km
- Flat Ridge 2 Wind Farm 596 km
- Limon III Wind Farm 840 km
- Limon I & II Wind Farms 849 km
- Cedar Point Wind Farm 859 km
- Peetz Table Wind Farm 1005 km
- Cedar Creek 1 Wind Farm 1017 km
- Altamont Pass Wind Farm 2030 km
- Electrical substation 2.9 km
- Wind turbine (Sweetwater 3 Wind Farm) 4.3 km
- Wind turbine (Sweetwater 3 Wind Farm) 4.7 km
- Wind turbine (Sweetwater 3 Wind Farm) 5.1 km
- Electrical substation (Sweetwater 2 Wind Farm) 5.6 km
- Electricity Sub-station 6.4 km
- Football Stadium 7 km
- Buzzi Unicem Maryneal 7.6 km
- Wind turbine (Sweetwater 1 & 2 Wind Farm) 7.6 km
- Gesin Ranches Airport (86XS) 11 km
Electrical substation
Wind turbine (Sweetwater 3 Wind Farm)
Wind turbine (Sweetwater 3 Wind Farm)
Wind turbine (Sweetwater 3 Wind Farm)
Electrical substation (Sweetwater 2 Wind Farm)
Electricity Sub-station
Football Stadium
Buzzi Unicem Maryneal
Wind turbine (Sweetwater 1 & 2 Wind Farm)
Gesin Ranches Airport (86XS)