Tule I Wind Farm
USA /
California /
Pine Valley /
World
/ USA
/ California
/ Pine Valley
wind farm
Add category
Tule I Wind Farm is located in McCain Canyon about 3-10 miles north of Interstate 8 at Exit 65 (Boulevard, California). Commissioned in 2018, it is reported to consist of 57 GE Energy 2.3-107 wind turbines with a combined nominal capacity of 131.1 MW.
Current Google images (obtained at a late stage of construction) only show evidence for 51 turbine bases - plus a few cleared areas that look as if they had planned to put a turbine there but then chose not to.
Current Google images (obtained at a late stage of construction) only show evidence for 51 turbine bases - plus a few cleared areas that look as if they had planned to put a turbine there but then chose not to.
Nearby cities:
Coordinates: 32°45'53"N 116°17'41"W
- Altamont Pass Wind Farm 750 km
- Broadview Wind Farm 1233 km
- Limon I & II Wind Farms 1346 km
- Cedar Point Wind Farm 1352 km
- Limon III Wind Farm 1369 km
- Cedar Creek 1 Wind Farm 1416 km
- Capricorn Ridge Wind Farm 1434 km
- Peetz Table Wind Farm 1457 km
- Horse Hollow II Wind Energy Center 1507 km
- Flat Ridge 2 Wind Farm 1704 km
- Lark Canyon OHV Area 4.5 km
- McCain Valley Conservation Camp 9 km
- Golden Acorn Casino & Travel Center 9 km
- Sweeney Pass 13 km
- DeAnza Springs Resort 16 km
- Jacumba Hot Springs, California 19 km
- Jacumba Airport 21 km
- Electrical Substation 22 km
- Moon Valley, Also called Valle de Luna 26 km
- Ocotillo, California 28 km