Sherbino II Wind Farm
USA /
Texas /
Fort Stockton /
World
/ USA
/ Texas
/ Fort Stockton
wind farm
Add category
Sherbino II Wind Farm (sometimes called Sherbino Mesa Wind Farm Phase 2) is located on the mesa top 6 miles south of Interstate 10 between Exits 277 & 285, about 23 miles east of Fort Stockton, Texas. Commissioned in 2011, it originally consisted of 60 Clipper Liberty C-96 (2,500-kW) wind turbines with a combined nominal capacity of 150 MW.
The currently most recent imagery available (2017) indicates that 2 of the 60 are no longer standing, however, reducing the capacity to 145 MW.
The currently most recent imagery available (2017) indicates that 2 of the 60 are no longer standing, however, reducing the capacity to 145 MW.
Nearby cities:
Coordinates: 30°46'33"N 102°30'1"W
- Capricorn Ridge Wind Farm 197 km
- Horse Hollow II Wind Energy Center 275 km
- Broadview Wind Farm 456 km
- Flat Ridge 2 Wind Farm 828 km
- Limon III Wind Farm 970 km
- Limon I & II Wind Farms 972 km
- Cedar Point Wind Farm 983 km
- Peetz Table Wind Farm 1142 km
- Cedar Creek 1 Wind Farm 1144 km
- Altamont Pass Wind Farm 1930 km
- Bakersfield, Texas 23 km
- Girvin, Texas 34 km
- Upton County Airport 47 km
- Yates Oil Field 54 km
- Solar Field 56 km
- Upton County Solar 1 57 km
- Upton County Solar 2 58 km
- King Mountain 61 km
- Castle Mountain 62 km
- Castle Gap Park 62 km