Mesa Wind Farm
USA /
California /
Cabazon /
World
/ USA
/ California
/ Cabazon
wind farm
Add category
Mesa Wind Farm is located on top of the mesas about 2 miles northwest of Whitewater, California (at Interstate 10 Exit 114). Commissioned in 1983, it consisted of 460 Vestas V15 (65-kW) wind turbines on trestle towers with a combined nominal capacity of 29.9 MW, although some of the turbines have become decommissioned (and sometimes removed) over the years.
Nearby cities:
Coordinates: 33°57'3"N 116°39'58"W
- Altamont Pass Wind Farm 629 km
- Broadview Wind Farm 1241 km
- Limon I & II Wind Farms 1300 km
- Cedar Point Wind Farm 1304 km
- Limon III Wind Farm 1324 km
- Cedar Creek 1 Wind Farm 1355 km
- Peetz Table Wind Farm 1398 km
- Capricorn Ridge Wind Farm 1472 km
- Horse Hollow II Wind Energy Center 1541 km
- Flat Ridge 2 Wind Farm 1690 km
- White Water Canyon 2.9 km
- The Matterdome 3.2 km
- White Water Rock Mine 3.5 km
- Trout fishing-Whitewater 4.2 km
- Whitewater Trout Farm 4.4 km
- PCT at Whitewater River floodplain 4.5 km
- Start PCT crossing at Whitewater River 6.7 km
- End PCT crossing at Whitewater River 7.1 km
- Coachella Valley 44 km
- San Andreas Fault Zone (approximate) 62 km