Originally, the electrical needs of the island were provided by four diesel generators. In 1998 two wind turbines were installed through a joint project of the Department of Defense, the Department of Energy, and the Environmental Protection Agency working through the Federal Energy Management Program (FEMP). A third turbine was installed in 1999, allowing the wind to produce electricity that provides at least 25% of the island's total electricity demand with optimum winds.
The three NEG Micon 225/30 wind turbines are rated for an output of 225 kW each. They have rotors with an approximate diameter of 30 meters, and start producing power at wind speeds of nine mph (4 m/s) and work well up to 56 mph (25 m/s). When the winds are very low or calm, diesel generators kick in to provide power. With the wind turbines, diesel use has been greatly reduced with fuel savings projected to be more than $160,000 annually. The Navy is also considering a fourth turbine for San Clemente to use for water desalination.
Initial investment: $1,956,510
Payback period: 6.65 years
Cost savings: $294,000
The three NEG Micon 225/30 wind turbines are rated for an output of 225 kW each. They have rotors with an approximate diameter of 30 meters, and start producing power at wind speeds of nine mph (4 m/s) and work well up to 56 mph (25 m/s). When the winds are very low or calm, diesel generators kick in to provide power. With the wind turbines, diesel use has been greatly reduced with fuel savings projected to be more than $160,000 annually. The Navy is also considering a fourth turbine for San Clemente to use for water desalination.
Initial investment: $1,956,510
Payback period: 6.65 years
Cost savings: $294,000
Nearby cities:
Coordinates: 32°59'12"N 118°33'8"W
- Altamont Pass Wind Farm 612 km
- Broadview Wind Farm 1433 km
- Limon I & II Wind Farms 1505 km
- Cedar Point Wind Farm 1510 km
- Limon III Wind Farm 1529 km
- Cedar Creek 1 Wind Farm 1559 km
- Peetz Table Wind Farm 1602 km
- Capricorn Ridge Wind Farm 1645 km
- Horse Hollow II Wind Energy Center 1717 km
- Flat Ridge 2 Wind Farm 1891 km
- Wilson Cove Area 1.8 km
- Special Warfare Training Area Three (SWAT-3), SCI Underwater Range 2.1 km
- San Clemente Naval Auxiliary Air Station (site) 4.7 km
- Naval Auxiliary Landing Field, San Clemente Island 5.1 km
- Munitions Bunkers 5.7 km
- Lockheed UGM-27 Launch Area (site) 9 km
- San Clemente Island 10 km
- China Point 24 km
- Cortes Bank 81 km
- Wreck of USS Agerholm (DD-826) 95 km
Wilson Cove Area
Special Warfare Training Area Three (SWAT-3), SCI Underwater Range
San Clemente Naval Auxiliary Air Station (site)
Naval Auxiliary Landing Field, San Clemente Island
Munitions Bunkers
Lockheed UGM-27 Launch Area (site)
San Clemente Island
China Point
Cortes Bank
Wreck of USS Agerholm (DD-826)