In October 2005, AECL was awarded the Re-tubing contract by Bruce Power as part of the refurbishment of the Bruce A Units 1 and 2 CANDU reactors. AECL’s scope of the project is expected to take approximately 41 months to complete and includes the removal and replacement of 480 pressure tubes and 480 calandria tubes in each of the two reactors, along with the associated hardware.