ORD Terminal 3 (Chicago, Illinois)

USA / Illinois / Rosemont / Chicago, Illinois
 airport terminal  Add category

Terminals 2 and 3 were completed in the 1962 terminal expansion, which allowed almost all Chicago domestic flights to move from Midway Airport to O'Hare. Terminal 3 originally had Concourses G, H, and K, with 29 gates that primarily served the airlines American, TWA, Delta, Lake Central, North Central and Trans Canada. The rotunda building, originally a large upscale restaurant, is now occupied by a combination of food concessions and federal agency offices. The "Y" shaped H/K concourse structure originally had a public observation deck on its central roof.

The 1962 building had a single-level frontage roadway. An upper-level departure frontage roadway was added in the late 1960s. A major expansion of T3 occurred in 1983, when the landside terminal section was enlarged eastward by about 30%, and the 10-gate Concourse L was constructed for the use of Delta Air Lines. In the late 1980s and early 1990s, American expanded the H/K concourses. As TWA's services diminished, American took over most gates on Concourse G.

In 2009 a major expansion of the landside section is well underway, deepening it toward its frontage roadways and filling in space between T2 and T3.
Nearby cities:
Coordinates:   41°58'31"N   87°54'0"W

Comments

  • Terminals 2 and 3 were completed in the 1962 terminal expansion, which allowed almost all Chicago domestic flights to move from Midway Airport to O'Hare. Terminal 3 originally had Concourses G, H, and K, with 29 gates that primarily served the airlines American, TWA, Delta, Lake Central, North Central and Trans Canada. The rotunda building, originally a large upscale restaurant, is now occupied by a combination of food concessions and federal agency offices. The "Y" shaped H/K concourse structure originally had a public observation deck on its central roof. The 1962 building had a single-level frontage roadway. An upper-level departure frontage roadway was added in the late 1960s. A major expansion of T3 occurred in 1983, when the landside terminal section was enlarged eastward by about 30%, and the 10-gate Concourse L was constructed for the use of Delta Air Lines. In the late 1980s and early 1990s, American expanded the H/K concourses. As TWA's services diminished, American took over most gates on Concourse G. In 2009 a major expansion of the landside section is well underway, deepening it toward its frontage roadways and filling in space between T2 and T3.
This article was last modified 13 years ago