Jordberga Wind farm
| 2010s construction
Sweden /
Skene /
Trelleborg /
World
/ Sweden
/ Skene
/ Trelleborg
wind farm, 2010s construction

3 turbines: Vestas V90/1800 (power 1.8 MW, diameter 90 m).
Hub height: 80 m.
Total nominal power: 5.4 MW.
Hub height: 80 m.
Total nominal power: 5.4 MW.
Nearby cities:
Coordinates: 55°25'45"N 13°24'10"E
- EnBW Baltic 2 Wind Farm 50 km
- EnBW Baltic 1 Wind Farm 103 km
- Nysted Wind Farm (Rødsand) 146 km
- Nysted Wind Farm (Rødsand II) 156 km
- Tymien Wind Farm 205 km
- Konczewo Wind Farm 244 km
- Kobylnica Wind Farm 252 km
- Wicko Wind Farm 281 km
- Čiūteliai wind farm 502 km
- Šilutė wind farm 516 km
- Jordberg sugar plant 1.9 km
- Skivarp Sugar Plant 11 km
- Apron 12 km
- Sturup Raceway 12 km
- taxiway 12 km
- runway 17/35 12 km
- Malmö Sturup International Airport (MMX) 12 km
- Apron 13 km
- Marsvinsholm Castle 20 km
- Sövde Lake 23 km