Wikimapia is a multilingual open-content collaborative map, where anyone can create place tags and share their knowledge.

Vertical Integration Building (Demolished)

USA / Florida / Cape Canaveral /
 historical layer / disappeared object  Add category

The Vertical Integration Building (VIB) was used to stack the first and second stages of the core vehicle of the Titan III, Titan 34D and Titan IV rockets. The core vehicle would be stacked vertically on a transporter inside one of the VIB's four high bays. Following check out of the core vehicle, it would be rolled over to the SMAB or SMARF for SRM stacking. It was recently demolished.
Nearby cities:
Coordinates:   28°31'52"N   80°35'39"W
This article was last modified 12 years ago