Arauco Wind Farm
Argentina /
La Rioja /
World
/ Argentina
/ La Rioja
/ La Rioja
wind farm
Add category
Arauco Wind Farm is located in the San Juan province of Argentina, along provincial Highway 9 about 15 km south of Aimogasta. It was commissioned in 2 phases (2011 & 2014), each phase consisting of 12 IMPSA IWP-83-2100 wind turbines (power 2.1 MW, diameter 83 m) with a combined nominal capacity of the 24 turbines of 50.4 MW.
Phases III & IV, with Gamesa turbines, are expected to be completed in 2019.
Phases III & IV, with Gamesa turbines, are expected to be completed in 2019.
Nearby cities:
Coordinates: 28°41'56"S 66°45'15"W
- Juan Pablo Terra Wind Farm 993 km
- GCEE Wind Farm - Peralta I & II 1077 km
- Pintado Wind Farm 1132 km
- Florida I & II Wind Farms 1172 km
- Chuí Wind Farm 1383 km
- Hermenegildo Wind Farm 1383 km
- Geribatu Wind Farm 1385 km
- Santa Vitória do Palmar Wind Farms 1403 km
- Osório Wind Farm Complex 1597 km
- Bom Jardim Wind Farm Complex 1674 km
- Wind turbine (Arauco I Wind Farm) 0.4 km
- Wind turbine (Arauco I Wind Farm) 0.4 km
- Wind turbine (Arauco I Wind Farm) 0.7 km
- Wind turbine (Arauco I Wind Farm) 0.7 km
- Wind turbine (Arauco I Wind Farm) 1 km
- Wind turbine (Arauco I Wind Farm) 1 km
- Wind turbine (Arauco I Wind Farm) 1.4 km
- Wind turbine (Arauco I Wind Farm) 1.7 km
- Wind turbine (Arauco I Wind Farm) 2.1 km
- Electrical substation (Arauco Wind Farm) 2.3 km
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Wind turbine (Arauco I Wind Farm)
Electrical substation (Arauco Wind Farm)