POLAVARAM MULTIPURPOSE IRRIGATION PROJECT
India /
Andhra Pradesh /
Chodavaram /
World
/ India
/ Andhra Pradesh
/ Chodavaram
irrigation, hydroelectric power station
![](https://wikimapia.org/img/wm-team-userpic.png)
This Irrigation Project is under construction and shall be completed by 2019. It will cater 80 TMC water and will link upto River Krishna. It will generate 960 MW Hydro Power. This is the first River Linking Project which has been sought by Sir Arthur Cotton in 1861 and the Governments have been attempting to implement since 1946. It will give life to almost 10 Districts in the State of Andhra Pradesh. The total cost of the Project including Power Plant as of 2016 is about Rs. 40,000 Crores.
Nearby cities:
Coordinates: 17°17'32"N 81°38'34"E
- Gandipalem Reservoir 359 km
- Nizam Sagar 410 km
- Sriramsagar/Pochampad 431 km
- Majalgaon Reservoir 630 km
- Deo Irrigation Project Area 686 km
- Pavana Dam 886 km
- Gangapur Dam 900 km
- Zabol Irrigation and Drainage System 2545 km
- Irrigation ponds 3165 km
- TadCo Irrigation Project ( Center Pivots, Drip Irrigation, Sprinkler Irrigation ) 3465 km
- POLAVARAM BARRAGE SADDLE DAM 1.5 km
- Polavaram National Irrigation Project 1.9 km
- POLAVARAM CANAL TUNNEL NO 1 2.2 km
- POLLAVARAM BARRAGE SADDLE DAM 2.4 km
- POLAVARAM CANAL TUNNEL NO:2 3.4 km
- Karmalpuram 5.4 km
- UdhathaPalli 7.9 km
- Kotturu Chervu 8.7 km
- Tanalakunta Cheruvu 10 km
- Papikonda Wildlife Sanctuary,Papikondalu Boating And Resorts 18 km