Lake Maumelle History
Little Rock Municipal Water Works originally developed Lake Maumelle as a second raw water supply. Studies that began in 1947, preceded the water utility’s development of a second source lake to meet the area’s growing demand for water service. Construction of the first source, Lake Winona, located approximately 18 miles west of Lake Maumelle, in the foothills of the Ouachita Mountains, spanned from 1936 to 1938. The Lake Winona project got under way immediately after the city of Little Rock purchased the local water system, south of the Arkansas River, from private owners in 1936.
With the assistance of consulting engineers, the water utility thoroughly investigated several prospective sources prior to selecting a site for the second reservoir. Along with the decision to build the lake was a public vote on a new water rate schedule to finance the project.
The water utility initiated preliminary surveys and mapping of the Lake Maumelle site in February 1954, and completed the work in December 1954. Sub-surface investigations at the project site followed in March 1956. The studies proved favorable and the engineers proceeded with project design.
Water officials awarded the first major contract for construction of the dam and spillway in July 1956. In June 1958, water from the new Lake Maumelle source flowed into the system for the first time. The overall project included two, 30 million gallon per day (MGD), constant-speed pumps and cost approximately $9 million.
In 1975, a third pump increased the firm capacity of the Lake Maumelle Pumping Station to 90 MGD. The pump, driven by a 2,250 horsepower (hp) motor, also added variable speed drive capabilities to the facility. In 1984, the water utility replaced the 2,250 hp motor and variable speed drive with a constant speed, 2,500 hp motor. The third pump, motor, associated piping, and electrical equipment cost about $1 million.
In 1983, the water utility added a fourth, 30 MGD pump at a cost of $974,944. The last pump addition increased the station’s firm capacity to approximately 113 MGD.
In 1988, the installation of an emergency standby, power generating station, equipped the water utility with backup power in the event of a failure on the commercial electric system. The project included two, 3,000 hp diesel engines; two, 2,000 kilowatt generators; and variable frequency drive equipment. The generators have the capacity to power two of the 30 MGD pumps. This capability, coupled with the gravity supply from Lake Winona, can provide customers with up to 84 MGD (more than the current, average-daily demand) during a complete electrical power outage at Lake Maumelle.
With the standby generating facility, the water utility is also able to control additional electric power costs incurred during peak demand periods.
In 2004, CAW completed construction of a second intake structure at the Lake Maumelle pumping station. Phase I of the installation included two, 15 MGD pumps and space for an additional 30 MGD pump. In addition to supporting the increased treatment capacity of the Jack H. Wilson Treatment Plant, the new $7.7 million intake enhanced the overall reliability and integrity of the raw-water delivery system. The year 2010 brought about Phase II of the second intake project with the installation of the seventh pump at Lake Maumelle at a cost of $2.4 million. This 2,250 hp, 34 MGD pump project boosts the firm capacity of the pump station to approximately 133 MGD and completes the build-out of the intakes and pump station at the existing facilities.
Little Rock Municipal Water Works originally developed Lake Maumelle as a second raw water supply. Studies that began in 1947, preceded the water utility’s development of a second source lake to meet the area’s growing demand for water service. Construction of the first source, Lake Winona, located approximately 18 miles west of Lake Maumelle, in the foothills of the Ouachita Mountains, spanned from 1936 to 1938. The Lake Winona project got under way immediately after the city of Little Rock purchased the local water system, south of the Arkansas River, from private owners in 1936.
With the assistance of consulting engineers, the water utility thoroughly investigated several prospective sources prior to selecting a site for the second reservoir. Along with the decision to build the lake was a public vote on a new water rate schedule to finance the project.
The water utility initiated preliminary surveys and mapping of the Lake Maumelle site in February 1954, and completed the work in December 1954. Sub-surface investigations at the project site followed in March 1956. The studies proved favorable and the engineers proceeded with project design.
Water officials awarded the first major contract for construction of the dam and spillway in July 1956. In June 1958, water from the new Lake Maumelle source flowed into the system for the first time. The overall project included two, 30 million gallon per day (MGD), constant-speed pumps and cost approximately $9 million.
In 1975, a third pump increased the firm capacity of the Lake Maumelle Pumping Station to 90 MGD. The pump, driven by a 2,250 horsepower (hp) motor, also added variable speed drive capabilities to the facility. In 1984, the water utility replaced the 2,250 hp motor and variable speed drive with a constant speed, 2,500 hp motor. The third pump, motor, associated piping, and electrical equipment cost about $1 million.
In 1983, the water utility added a fourth, 30 MGD pump at a cost of $974,944. The last pump addition increased the station’s firm capacity to approximately 113 MGD.
In 1988, the installation of an emergency standby, power generating station, equipped the water utility with backup power in the event of a failure on the commercial electric system. The project included two, 3,000 hp diesel engines; two, 2,000 kilowatt generators; and variable frequency drive equipment. The generators have the capacity to power two of the 30 MGD pumps. This capability, coupled with the gravity supply from Lake Winona, can provide customers with up to 84 MGD (more than the current, average-daily demand) during a complete electrical power outage at Lake Maumelle.
With the standby generating facility, the water utility is also able to control additional electric power costs incurred during peak demand periods.
In 2004, CAW completed construction of a second intake structure at the Lake Maumelle pumping station. Phase I of the installation included two, 15 MGD pumps and space for an additional 30 MGD pump. In addition to supporting the increased treatment capacity of the Jack H. Wilson Treatment Plant, the new $7.7 million intake enhanced the overall reliability and integrity of the raw-water delivery system. The year 2010 brought about Phase II of the second intake project with the installation of the seventh pump at Lake Maumelle at a cost of $2.4 million. This 2,250 hp, 34 MGD pump project boosts the firm capacity of the pump station to approximately 133 MGD and completes the build-out of the intakes and pump station at the existing facilities.
Wikipedia article: http://en.wikipedia.org/wiki/Lake_Maumelle
Nearby cities:
Coordinates: 34°52'45"N 92°34'26"W
- Greers Ferry Lake 86 km
- Lake Ouachita 92 km
- Norfork Lake 189 km
- Bull Shoals Lake 194 km
- Table Rock Lake 223 km
- Beaver Lake 223 km
- Lake O' The Pines 296 km
- Lake Oologah 344 km
- Lake Fork 362 km
- Lake Palestine 399 km
- The Alotian Club 2.3 km
- Rattlesnake Ridge Natural Area 6.3 km
- Pinnacle Mountain State Park 10 km
- Chenal CC Bear Den Mountain Course 13 km
- Chenal CC Founders Course 15 km
- Pleasant Hill, AR 21 km
- Hurricane Golf and Country Club 31 km
- Longhills Golf Course 31 km
- Saline County Regional Airport (KSUZ) 33 km
- Owensville, AR 37 km
Comments