The 5th and 6th Chernobyl reactors were under construction when the disaster at reactor #4 occurred. These reactors were never put into service.
The fifth block was to be introduced in 1987 and sixth in 1989.
After the accident, construction was frozen, and subsequently canceled.
The fifth block was to be introduced in 1987 and sixth in 1989.
After the accident, construction was frozen, and subsequently canceled.
Nearby cities:
Coordinates: 51°22'53"N 30°7'9"E
- Unfinished Sixth Unit 0.1 km
- Machine room of the fifth reactor 0.1 km
- Cooling tower 0.9 km
- Сooling tower (unfinished) 1 km
- Unfinished “Pioneers Palace” 6 km
- prospekt Budyvelnikiv, 21 6.2 km
- Unfinished building 6.2 km
- Unfinished house 6.4 km
- Unfinished building 14 km
- Starch factory 97 km
- Canal for cooling 0.4 km
- Chornobyl Nuclear Power Plant 0.4 km
- Lake for cooling 0.4 km
- 330 kV Switchyard 0.9 km
- Lake for cooling 1 km
- Spent Nuclear Fuel Storage 1.1 km
- Outdoor Switchyards of the Chernobyl NPP 1.3 km
- 750 kV Switchyard 1.6 km
- Cooling pond 3.9 km
- Chornobyl Exclusion Zone 17 km