The New Bridge (Troyan)

Bulgaria / Lovec / Trojan / Troyan
 road bridge, 2021_construction
 Upload a photo

Reinforced concrete bridge over the Beli Osam River with a length of 43.2 m, opened on November 4, 2021.
New road connection between road II-35 and road III-357, as the bridge connects the main street "Vasil Levski" on one bank of the river and the bypass street "Acad. Angel Balevski ”on the opposite shore.
Nearby cities:
Coordinates:   42°54'4"N   24°42'56"E
This article was last modified 4 years ago