Solar power plant
Ukraine /
Khersonska /
Partyzany /
World
/ Ukraine
/ Khersonska
/ Partyzany
, 3 km from center (Партизани)
solar farm
Add category
The power plant's capacity is 18 MW.
The area of the territory is 30 hectares.
The project cost is $ 18,000,000.
Commissioned in 2018, construction lasted three months.
The area of the territory is 30 hectares.
The project cost is $ 18,000,000.
Commissioned in 2018, construction lasted three months.
Nearby cities:
Coordinates: 46°20'57"N 34°46'0"E
- Solar power stations "Veliton-2.5" and "Velihen-6,0" 17 km
- Solar power plant 50 km
- Solar power station "Nove" 135 km
- Vladislavivka Solar Farm 142 km
- Solar Field 147 km
- Solar Field 148 km
- Solar power station "Ordzhonikidze" 155 km
- Perovo / Perove Solar Station 168 km
- Nikolaevka/Mykolaivka Solar Station 173 km
- Solar power plant panel field 779 km
- Cemetery 1.1 km
- Rykove Railway station 2.1 km
- Komunarske 3.1 km
- Volodymyrivka 4.1 km
- Malynivka 5.9 km
- Zaporozhets 6.8 km
- Cemetery 7.6 km
- Reservoir 8.5 km
- Former Reservoir 10 km
- Henichesk Raion 20 km