Gukovskaya wind farm — Gukovskaya-1 platform

Russia / Rostov / Likhovskoy /
 wind farm, 2019 construction

26 wind wind turbines connected by cable power lines and communications.
The wind farm also includes a control module, diesel generator set, transformer substation and access roads.
Vestas™ V126-3.45 MW wind turbines with a capacity of 3.8 MW each were installed in the autumn/fall of 2019.
The installed capacity of this platform is 98.8 MW, entire station — 198 MW.
The height of the wind power plant to the axis of the rotor is 87 m.

A wind turbine with three blades is installed on the tower. Subject to the wind conditions, the angle of inclination of the blades is continuously changing and maintained at the optimum level. Each wind power installation is equipped with a light barrier.