wind farm, 2011_construction

The Östra Herrestad wind farm, situated about 10 km west of Simrishamn, Sweden, consists of 9 Vestas V90 turbines.
The wind farm is locally knows as "Framtidsparken" (The Futurepark), and the nine turbines, which are numbered from 1 to 11, have also been given individual names by the community. From west to east: #9: Kraftvingen, #10: Miljövingen, #11: Framtidsvingen, #6: Sparvingen, #5: Ekonomivingen, #3: Energivingen, #2: Elvingen, #1: Nutidsvingen och #8: Naturvingen.
The wind farm is locally knows as "Framtidsparken" (The Futurepark), and the nine turbines, which are numbered from 1 to 11, have also been given individual names by the community. From west to east: #9: Kraftvingen, #10: Miljövingen, #11: Framtidsvingen, #6: Sparvingen, #5: Ekonomivingen, #3: Energivingen, #2: Elvingen, #1: Nutidsvingen och #8: Naturvingen.
Nearby cities:
Coordinates: 55°31'32"N 14°10'22"E
- EnBW Baltic 2 Wind Farm 88 km
- EnBW Baltic 1 Wind Farm 141 km
- Tymien Wind Farm 180 km
- Nysted Wind Farm (Rødsand) 192 km
- Nysted Wind Farm (Rødsand II) 202 km
- Konczewo Wind Farm 209 km
- Kobylnica Wind Farm 215 km
- Wicko Wind Farm 238 km
- Čiūteliai wind farm 453 km
- Šilutė wind farm 467 km
- Gärsnäs Castle 0.9 km
- Gärsnäs Möbler 2.4 km
- Glimmingehus 4.6 km
- Borrby 132 kV-Substation 8.3 km
- Sweden’s first innovative microgrid 10 km
- Solar Field 10 km
- Gislövshammar NAVTEX-Transmitter 10 km
- Backafestivalen 11 km
- Simrishamn Skåne 12 km
- Sandhammaren 15 km