power house, water supply treatment plant
Az-Zour North Independent Water and Power Project (IWPP) phase 1 is located at Az-Zour, approximately 100km south of Kuwait City. The desalination plant will comprise a multiple-effect distillation (MED) unit capable of producing 107 million imperial gallons per day (MIGD) (486,400m³/d) of drinking water, which is equivalent to 20% of Kuwait's installed water treatment capacity.
The desalination plant is being built along with a gas-fired 1,500MW combined cycle power plant. The construction works for the desalination plant and the integrated power plant are expected to be completed by 2016.
The treated water and the power produced from the complex will be supplied to the country's national power and water grid operator Kuwait Ministry of Electricity and Water (MEW) under a 40-year long-term Energy Conversion and Water Purchase Agreement (ECWPA).
The desalination plant is being built along with a gas-fired 1,500MW combined cycle power plant. The construction works for the desalination plant and the integrated power plant are expected to be completed by 2016.
The treated water and the power produced from the complex will be supplied to the country's national power and water grid operator Kuwait Ministry of Electricity and Water (MEW) under a 40-year long-term Energy Conversion and Water Purchase Agreement (ECWPA).
Nearby cities:
Coordinates: 28°42'50"N 48°22'51"E
- Sudair L&T 429 km
- Barakah Nuclear Power Plant 650 km
- Jebel Ali Power & Desalination Plant 780 km
- Aldhafra PV2 solar power plant 791 km
- Sheikh Mohammed Bin Rashid Al Maktoum Solar Park 816 km
- Noor Abu Dhabi Solar Plant 839 km
- Ibri II Solar Field 982 km
- Binalud Wind Farm 1313 km
- Hub Power Company (HUBCO) 1864 km
- Karachi Nuclear Power Complex 1873 km
- Kuwait, KLNG Project 1.1 km
- TOSHIBA CORPORATION KUWAIT AZ-ZOUR 400/300/33KV SUBSTATION M. OMRAN 1.3 km
- Mina Al-Zour Power Plant 1.3 km
- Azour Power Station Tank Yard 1.4 km
- Az - zour Gas Turbine Project, Ministry of Electricity & Water ( Karaikal S.M. Arif Maricar Technical Clerk) 1.7 km
- Az-Zour EPP2008, MEW-Alganim-TJSB-PJBS 1.7 km
- Az-Zour 09 and Add-on 56 (CCGT-3) 2.1 km
- Buck Sands Golf Course Chevron Kuwait 2.2 km
- KOC SPRING CAMP AREA 2.4 km
- Kuwait Chevron 2.4 km
Kuwait, KLNG Project
TOSHIBA CORPORATION KUWAIT AZ-ZOUR 400/300/33KV SUBSTATION M. OMRAN
Mina Al-Zour Power Plant
Azour Power Station Tank Yard
Az - zour Gas Turbine Project, Ministry of Electricity & Water ( Karaikal S.M. Arif Maricar Technical Clerk)
Az-Zour EPP2008, MEW-Alganim-TJSB-PJBS
Az-Zour 09 and Add-on 56 (CCGT-3)
Buck Sands Golf Course Chevron Kuwait
KOC SPRING CAMP AREA
Kuwait Chevron