Operator: Hub River Power
Configuration: 4 X 323 MW
Operation: 1997
Fuel: fuel oil
Boiler supplier: IHI
T/G supplier: Ansaldo
EPC: Ansaldo, Mitsui, IHI, Campenon Bernard
Quick facts: The plant near Hub Chowki, Balochistan, is a flagship independent power project and can supply over 10% of Pakistan's electricity. Fuel oil is delivered by a specially built 78km pipeline and power is delivered to WAPDA by a 180km, dual-circuit 500kV transmission line.
Nearby cities:
Coordinates:   24°54'16"N   66°41'37"E