FM 2818/FM 2154 Interchange (College Station, Texas)
| overpass / flyover
USA /
Texas /
College Station /
College Station, Texas
World
/ USA
/ Texas
/ College Station
World / United States / Texas
overpass / flyover, invisible
Construction began in summer 2009 and concluded in spring 2011. The design eliminated a stoplight and a railroad crossing for 2818, but introduced another light for Wellborn. It was done in conjunction of a widening of Wellborn, which turned the congested two-way rural road into a modern six-lane boulevard.
Nearby cities:
Coordinates: 30°35'11"N 96°19'41"W
- Captian John Young Flyover 165 km
- Bridge 953 km
- Chouteau Bridge 967 km
- Flyover 1186 km
- Monument Hill 1229 km
- Marquette–Joliet Bridge 1461 km
- New Overpass 2091 km
- SR 397 overpass 2624 km
- Sherwood Park Freeway, Alberta Highway 216 Interchange 2898 km
- Coast Meridian Overpass 3039 km
- South Knoll Area Neighborhood 1.9 km
- Southside Area Neighborhood 2 km
- Texas A&M University (TAMU) 2.7 km
- West Campus 2.9 km
- The Estates at River Run 5.1 km
- Atlas 6.3 km
- Traditions Golf Club & Community 6.7 km
- Brazos County 7.6 km
- O.D. Butler, Jr. Animal Science Complex 8.9 km
- Texas A&M University Farm 11 km