Wastewater Department Sucrose Drive Wastewater Treatment Plant
USA /
Louisiana /
New Iberia /
Sucrose Drive, 800
World
/ USA
/ Louisiana
/ New Iberia
World / United States / Louisiana
wastewater treatment plant
Add category
Built in 2003, this plant(not shown on this imagery) can treat up to 12 million gallons per day. The treatment configuration consists of 8 redundant Sequencing Batch Reactors, and aerobic digester, 8 sand filtration units, a Cholrine Contact Chamber, and Belt Sludge Dewatering Press.
Director of Wastewater: Vincent S Palumbo II, PE
Environmental Compliance Officer: Marc E Duhon, CES
Plant Superintendant: Johnny Romero
Director of Wastewater: Vincent S Palumbo II, PE
Environmental Compliance Officer: Marc E Duhon, CES
Plant Superintendant: Johnny Romero
Nearby cities:
Coordinates: 29°59'35"N 91°50'46"W
- Wastewater Treatment Facility 101 km
- sewage treatment plant 221 km
- City of Baytown Northeast Wastewater Treatment Plant 298 km
- GCA-Bayport Industrial Wastewater Treatment Facility 312 km
- Nacogdoches Wastewater Treatment Plant 320 km
- South Austin Regional Wastewater Treatment Plant 556 km
- San Antonio Water System Dios Rios Water Recycling Plant 643 km
- Leon Creek Water Reclamation Plant 651 km
- San Antonio Water System (SAWS) 663 km
- Nuevo Laredo Wastewater Treatment Plant 800 km
- Port of Iberia 6 km
- Daspit, LA 6.7 km
- Spanish Lake 7.2 km
- Lozes, LA 12 km
- Avery Island, Louisiana 12 km
- Lake Peigneur 13 km
- Duchamp, LA 15 km
- Windy Hills Ranch 17 km
- Milton, Louisiana 25 km
- Live Oak Plantation 32 km