Seabreeze Bridge (Daytona Beach, Florida)
USA /
Florida /
Holly Hill /
Daytona Beach, Florida
World
/ USA
/ Florida
/ Holly Hill
World / United States / Florida
bridge
Add category
Built by the GLF Construction Corporation, the scope of work on this project for the Florida Department of Transportation, District 5, included the construction of two high-level segmental bridges over the Intracoastal Waterway in Daytona Beach. The two structures were each respectively 2,290 LF and 2,320 LF in length. The segmental box girders were variable in depth and 49' wide in section. The lightest segment weighed 80 tons while the heaviest was 95 tons. The bridge was founded on 24" SQ concrete piles and supported on precast concrete piers. Construction cost for this project was $26.6M. GLF implemented a VECP (Value Engineering Change Proposal) on this project saving the Florida DOT both time and money.
Nearby cities:
Coordinates: 29°13'52"N 81°1'19"W
- Causeway between Canaveral Air Force Base and NASA Kennedy Space Center. 88 km
- Pineda Causeway 119 km
- Buckman Bridge 125 km
- Howard Frankland Bridge 213 km
- Gandy Bridge 214 km
- Courtney Campbell Causeway 215 km
- Gandy Bridge 215 km
- Bayside Bridge 217 km
- Gandy Blvd Overpass - (Under Construction) 221 km
- Interstate 275 (I-275) 240 km
- Latitude Margaritaville - Daytona 10 km
- Breakaway Trails 12 km
- Tomoka State Park 12 km
- Tiger Branch State Forest - East 14 km
- Tomoka Basin 16 km
- Bulow Creek State Park 18 km
- North Peninsula State Park 21 km
- Volusia County, Florida 30 km
- Flagler County Airport 32 km
- Flagler County, Florida 38 km