Gary Sanitary District Wastewater Treatment Plant (Gary, Indiana)
USA /
Indiana /
Gary /
Gary, Indiana /
West 3rd Avenue, 3600
World
/ USA
/ Indiana
/ Gary
World / United States / Indiana
wastewater treatment plant
Add category
Main Office:
Gary Sanitary District
3600 West 3rd Avenue
Gary, IN 46406
Phone: 219-944-0595
Fax: 219-977-8318
After creation of The Gary Sanitary District in 1938, The Board of Sanitary Commissioners initiated a construction program that included several interceptors and a wastewater treatment plant. This original plant was placed in service, at the present site, in 1940. The treatment facility was an activated sludge process designed to provide secondary treatment, with nominal capacity of 20 million gallons per day (MGD) to 40 millions gallons per day (MGD)Expansion and improvements began in 1962 to increase the treatment capacity of the plant.
Major construction followed in 1970, 1973, 1975, and 1982 (73-E,74-B&C,74-D, 77-A and 82-C-3). These projects basically dealt with the treatment plant. Projects 82-B (Divisions 1,2 and 3), 91-23, 91-AA, 91-CC, 91-DD3, 91-C-1&2,91-FF3, 91-J3, 91-GG-3 were formulated in 1991 and dealt with the lift stations, regulators and the sewer system(Black Oak) all of which were to satisfy the items in the Modified Consent Decree of 1990 that addressed combined sewer overflows. The combined total of all the projects since 1962 comes to approximately $150,000,000.00 dollars. The total asset value is over $400,000,000.00 dollars.
Gary Sanitary District
3600 West 3rd Avenue
Gary, IN 46406
Phone: 219-944-0595
Fax: 219-977-8318
After creation of The Gary Sanitary District in 1938, The Board of Sanitary Commissioners initiated a construction program that included several interceptors and a wastewater treatment plant. This original plant was placed in service, at the present site, in 1940. The treatment facility was an activated sludge process designed to provide secondary treatment, with nominal capacity of 20 million gallons per day (MGD) to 40 millions gallons per day (MGD)Expansion and improvements began in 1962 to increase the treatment capacity of the plant.
Major construction followed in 1970, 1973, 1975, and 1982 (73-E,74-B&C,74-D, 77-A and 82-C-3). These projects basically dealt with the treatment plant. Projects 82-B (Divisions 1,2 and 3), 91-23, 91-AA, 91-CC, 91-DD3, 91-C-1&2,91-FF3, 91-J3, 91-GG-3 were formulated in 1991 and dealt with the lift stations, regulators and the sewer system(Black Oak) all of which were to satisfy the items in the Modified Consent Decree of 1990 that addressed combined sewer overflows. The combined total of all the projects since 1962 comes to approximately $150,000,000.00 dollars. The total asset value is over $400,000,000.00 dollars.
Nearby cities:
Coordinates: 41°36'26"N 87°23'14"W
- Calumet Water Reclamation Plant 20 km
- Stickney Water Reclamation Plant 40 km
- Sludge Drying Beds 43 km
- Jones Island / Port of Milwaukee 163 km
- Paul L. Brunner Water Pollution Control Plant 199 km
- Muskegon County Wastewater Treatment Plant 216 km
- Fremont Wastewater Treatment Plant 234 km
- Detroit Wastewater Treatment Plant 360 km
- Houghton Lake Wastewater Treatment Facility 368 km
- Pickering Wastewater Treatment Plant 724 km
- Ambridge 1.3 km
- Westside Development District 1.4 km
- Brunswick 1.4 km
- Horace Mann 2 km
- Tolleston 2.8 km
- Tarrytown 3 km
- Westside 3.1 km
- Gary Landfill 3.3 km
- U.S. Steel Gary Works 3.8 km
- Lake County, Indiana 16 km