The Murowa diamond mine is a diamond mine located in south central Zimbabwe, about 40 kilometres from Zvishavane. The mine is majority owned and operated by the Rio Tinto Group, which also owns the Argyle diamond mine in Australia and part of the Diavik Diamond Mine in Canada.
The Murowa site's possibilities were first realized in 1997, when three diamond-bearing kimberlite pipes were discovered; over a period of three years of study, the two larger pipes have been determined to be economically feasible as mines. Construction of mine facilities was completed in late 2004. Preparation for mining included the forced relocation of 926 people living on the mine site to six farms purchased by a government relocation program. Limited mining operations began in Murowa in 2004, with full capacity expected to be reached sometime in 2005, although permitting problems have slowed progress toward this milestone. Full scale production is expected to process 200,000 tonnes of ore annually, although it is possible to push production to as much as one million tonnes annually through further capital investment.
The mine is a combination of open pit and underground construction; current estimates put construction costs at $61 million USD. Current estimates of mine reserves are 19 million tonnes of ore, with an ore grade of 0.9 carats (180 mg) per tonne. Rio Tinto estimates that over the life of the mine, prices for the Murowa's production will fetch an average price of $65 USD per carat (325 $/g).
The Murowa site's possibilities were first realized in 1997, when three diamond-bearing kimberlite pipes were discovered; over a period of three years of study, the two larger pipes have been determined to be economically feasible as mines. Construction of mine facilities was completed in late 2004. Preparation for mining included the forced relocation of 926 people living on the mine site to six farms purchased by a government relocation program. Limited mining operations began in Murowa in 2004, with full capacity expected to be reached sometime in 2005, although permitting problems have slowed progress toward this milestone. Full scale production is expected to process 200,000 tonnes of ore annually, although it is possible to push production to as much as one million tonnes annually through further capital investment.
The mine is a combination of open pit and underground construction; current estimates put construction costs at $61 million USD. Current estimates of mine reserves are 19 million tonnes of ore, with an ore grade of 0.9 carats (180 mg) per tonne. Rio Tinto estimates that over the life of the mine, prices for the Murowa's production will fetch an average price of $65 USD per carat (325 $/g).
Nearby cities:
Coordinates: 20°31'54"S 29°54'56"E
- Jwaneng Diamond Mine 699 km
- Kareevlei Diamond Mine 1021 km
- Mining Area 1 1655 km
- Lomonosov - Mine 9603 km
- фабрика №16 11946 km
- Victor Diamond Mne 13420 km
- Ekati Diamond Mine 14334 km
- Gahcho Kué Diamond Mine 14369 km
- Kennady North Project 14383 km
- Snap Lake Diamond Mine 14428 km
- Mimosa Platinum Mine 31 km
- berejena 72 km
- Mushandike Sanctuary 87 km
- Windsorpark 101 km
- Unki Platinum Mine 103 km
- Flesk Plots 108 km
- Great Zimbabwe National Monument - UNESCO World Heritage Site 110 km
- Lake Kyle 119 km
- Gweru-Thornhill Air Base 122 km
- Chatsworth 139 km
Comments