This is the mineral tenure area for the Snap Lake diamond mine and is owned and operated by De Beers Canada.
About the Snap Lake Mine:
Location: 63° 34’ 30” latitude and 110° 52’ 00” longitude, about 220 kilometres northeast of Yellowknife
Mine Area: ‹500 hectares
Recoverable grade: 1.2 carats per tonne
Annual tonne processing capacity: 1.1 million tonnes
Annual carat production capacity: 1.4 million carats
Snap Lake Mine Overview:
The Snap Lake Mine, De Beers’ first mine outside of Africa, is unique in Canada. Built on the shore of Snap Lake, 220 kilometres northeast of Yellowknife, the mine is Canada’s first completely underground diamond mine. The Snap Lake ore body is a 2.5 metre thick dyke that dips an average of 12-15° from the northwest shore down under the lake. It is unlike most diamond-bearing kimberlite deposits which are known as ‘pipes’ due to their conical or carrot-like shape.
The kimberlite was discovered in 1997 by Winspear Resources. De Beers Canada bought the project in the fall of 2000 and received permits to build and operate the mine in May 2004.
Following pre-development design and engineering work, construction started with the winter road in 2005. Because of Snap Lake’s remote location, building and operating the mine requires careful planning. Travel to the site is only possible by airplane for all but six to eight weeks of the year, when a seasonal ice road is used to re-supply the mine with equipment, parts and other materials needed to operate the mine.
By December 31, 2009 $1.4 billion dollars had been spent on construction and operation of the mine. Of that total, $977 million has been spent with NWT-based contractors and suppliers, including $630 million with Aboriginal businesses or Joint Ventures.
The mine commenced commercial production on January 16, 2008 and the Official Mine Opening took place on July 25, 2008.
De Beers is committed to sustainable development in local communities The Snap Lake Mine has signed four Impact Benefit Agreements (IBA) for the Snap Lake Mine including:
* Yellowknives Dene First Nation (November 2005),
* the Tlicho Government (March 2006),
* the North Slave Métis Alliance (August 2006)
* and Lutsel K’e and Kache Dene First Nation (April 2007).
Reference for information
www.debeerscanada.com/files_3/snap-lake-mine.php
www.debeersgroup.com/en/Exploration-and-mining/Mining-o...
www.diamondne.ws/2010/04/28/snap-lake-diamond-mine-surp...
About the Snap Lake Mine:
Location: 63° 34’ 30” latitude and 110° 52’ 00” longitude, about 220 kilometres northeast of Yellowknife
Mine Area: ‹500 hectares
Recoverable grade: 1.2 carats per tonne
Annual tonne processing capacity: 1.1 million tonnes
Annual carat production capacity: 1.4 million carats
Snap Lake Mine Overview:
The Snap Lake Mine, De Beers’ first mine outside of Africa, is unique in Canada. Built on the shore of Snap Lake, 220 kilometres northeast of Yellowknife, the mine is Canada’s first completely underground diamond mine. The Snap Lake ore body is a 2.5 metre thick dyke that dips an average of 12-15° from the northwest shore down under the lake. It is unlike most diamond-bearing kimberlite deposits which are known as ‘pipes’ due to their conical or carrot-like shape.
The kimberlite was discovered in 1997 by Winspear Resources. De Beers Canada bought the project in the fall of 2000 and received permits to build and operate the mine in May 2004.
Following pre-development design and engineering work, construction started with the winter road in 2005. Because of Snap Lake’s remote location, building and operating the mine requires careful planning. Travel to the site is only possible by airplane for all but six to eight weeks of the year, when a seasonal ice road is used to re-supply the mine with equipment, parts and other materials needed to operate the mine.
By December 31, 2009 $1.4 billion dollars had been spent on construction and operation of the mine. Of that total, $977 million has been spent with NWT-based contractors and suppliers, including $630 million with Aboriginal businesses or Joint Ventures.
The mine commenced commercial production on January 16, 2008 and the Official Mine Opening took place on July 25, 2008.
De Beers is committed to sustainable development in local communities The Snap Lake Mine has signed four Impact Benefit Agreements (IBA) for the Snap Lake Mine including:
* Yellowknives Dene First Nation (November 2005),
* the Tlicho Government (March 2006),
* the North Slave Métis Alliance (August 2006)
* and Lutsel K’e and Kache Dene First Nation (April 2007).
Reference for information
www.debeerscanada.com/files_3/snap-lake-mine.php
www.debeersgroup.com/en/Exploration-and-mining/Mining-o...
www.diamondne.ws/2010/04/28/snap-lake-diamond-mine-surp...
Wikipedia article: http://en.wikipedia.org/wiki/Snap_Lake_Diamond_Mine
Nearby cities:
Coordinates: 63°33'39"N 110°53'9"W
- Kennady North Project 55 km
- Gahcho Kué Diamond Mine 81 km
- Ekati Diamond Mine 131 km
- Victor Diamond Mne 1952 km
- фабрика №16 5199 km
- Lomonosov - Mine 5508 km
- Catoca Diamond Mine 12887 km
- Mining Area 1 14593 km
- Jwaneng Diamond Mine 14619 km
- Kareevlei Diamond Mine 14948 km
- Snap Lake 5.2 km
- Mackay Lake 45 km
- Island 46 km
- Fortress Island 103 km
- Aylmer Lake 134 km
- Island 165 km
- Clinton-Colden Lake 173 km
- Island 175 km
- Island 177 km
- Thor Lake Rare Earth Elements Project 184 km
Comments