Load Line 5
USA /
Ohio /
Windham /
World
/ USA
/ Ohio
/ Windham
World / United States / Ohio
Load Line 5, which was active from 1941 to 1945, consists of 18 process buildings ranging in size between 120 sq ft and 32,910 sq ft. Load Line 5 was a finished product assembly line. Five of the buildings manufactured primers, five buildings manufactured delay components, one building was used to manufacture detonator service magazines; and two buildings were used to assemble and test the final products.
Nearby cities:
Coordinates: 41°10'45"N 81°5'48"W
- Fuze and Booster Hill 2.3 km
- Group 5 Igloos 3.1 km
- D Block Igloos 4.6 km
- C Block Igloos 4.8 km
- Group 1 & 1A Magazines 5.1 km
- B Block Igloos 6.1 km
- Load Line 2 6.2 km
- Group 3 Magazines 6.8 km
- A Block Igloos 7.5 km
- Group 7 Igloos 9 km
- Camp Ravenna Joint Military Training Center 2.2 km
- Ravenna Township 13 km
- Shalersville Township 14 km
- Rootstown Township 15 km
- Atwater Township 18 km
- Berlin Township 21 km
- Randolph Township 21 km
- Smith Township 27 km
- Marlboro Township 29 km
- Goshen Township 30 km