Load Line 3

USA / Ohio / Windham /
 Upload a photo

39 Buildings (191,044 square feet)

Line included 1,000,000 volt X-Ray with steam and water supplied from sources outside the line. Constructed in 1942 for loading of bombs and was placed in standby in 1945. Mechanized and reactivated in 1954 at a cost of $588,614 for loading of 155mm shells. Included within fenced area were 100 tanks providing 36,400 square feet of storage space for GSA strategic and critical materials.
Nearby cities:
Coordinates:   41°11'35"N   81°2'17"W
This article was last modified 13 years ago