Terminal 3 (Cairo)
Egypt /
al-Qalyubiyah /
El Khanka /
Cairo
World
/ Egypt
/ al-Qalyubiyah
/ El Khanka
, 10 km from center (الخانكة)
World / Egypt
airport terminal
Add category
Given projected growth, and the limited ability to expand Terminal 2, the Egyptian Ministry of Civil Aviation began construction of Terminal 3 in 2004. The terminal was officially inaugurated by the Egyptian President Hosni Mubarak on Thursday 18th December, 2008 and opened for commercial operations on 27 April 2009. The facility is twice as large as the current two terminal buildings combined, with the capacity to handle 11 million passengers annually (6m international & 5m domestic) once the first phase is completed. It is located adjacent to Terminal 2, and the two terminals are initially connected by a bridge. Access roads have already been redesigned, and the parking lots relocated.
With its hub at the airport EgyptAir's operations were overhauled with the full transfer of its operations (international and domestic) into the state of the art terminal between 27 April and 15 June 2009. To implement the Star Alliance “Move Under One Roof” concept all alliance members serving the airport were relocated to the terminal by 1 August 2009.
The new terminal includes:
Two piers of extendable capacity and gates facilities serving domestic and international traffic, handled through contact and remote. The main building and the piers are connected by concourses. Two of the gates are equipped to handle the Airbus A380 aircraft. Provisions for a third pier are currently in the planning stages.
Terminal 3 has 23 gates (2 gates for the A380), 6 check-in islands consisting of 110 check-in counters (plus 10 mobile counters & 10 CUSS kiosks), 76 emigration and immigration counters (plus 5 biometric gates), 52 contact & remote aircraft parking stands (5 with multiple use), 425 FIDS, 15 public information points, 7 baggage carousels, 63 elevators, 50 moving walkways and 51 escalators.
Retails space covers more than 5,000m2 (4.034m2 occupied by EgyptAir Tourism & Duty Free Shops)
International Food Court with Oriantal, Asian and Western Food (incl. Burger King, Hippopotamus, Upper Crust)
Land side works including bridges and fly-over serving the traffic to and from the terminal building, surface car park areas (multi-story parking garage capable of holding more than 3,000 cars), a new access road connecting the airport with the Autostrad road (Cairo ring road) and upgrading the access roads.
With its hub at the airport EgyptAir's operations were overhauled with the full transfer of its operations (international and domestic) into the state of the art terminal between 27 April and 15 June 2009. To implement the Star Alliance “Move Under One Roof” concept all alliance members serving the airport were relocated to the terminal by 1 August 2009.
The new terminal includes:
Two piers of extendable capacity and gates facilities serving domestic and international traffic, handled through contact and remote. The main building and the piers are connected by concourses. Two of the gates are equipped to handle the Airbus A380 aircraft. Provisions for a third pier are currently in the planning stages.
Terminal 3 has 23 gates (2 gates for the A380), 6 check-in islands consisting of 110 check-in counters (plus 10 mobile counters & 10 CUSS kiosks), 76 emigration and immigration counters (plus 5 biometric gates), 52 contact & remote aircraft parking stands (5 with multiple use), 425 FIDS, 15 public information points, 7 baggage carousels, 63 elevators, 50 moving walkways and 51 escalators.
Retails space covers more than 5,000m2 (4.034m2 occupied by EgyptAir Tourism & Duty Free Shops)
International Food Court with Oriantal, Asian and Western Food (incl. Burger King, Hippopotamus, Upper Crust)
Land side works including bridges and fly-over serving the traffic to and from the terminal building, surface car park areas (multi-story parking garage capable of holding more than 3,000 cars), a new access road connecting the airport with the Autostrad road (Cairo ring road) and upgrading the access roads.
Nearby cities:
Coordinates: 30°6'34"N 31°23'51"E
- Terminal 3 393 km
- Marsa Matruh International Airport 424 km
- Al-Jouf Airport Facilities 840 km
- Adana Şakirpaşa International Airport 846 km
- Passengers Terminal 1109 km
- Hajj Terminal 1214 km
- Royal Terminal at KAIA Jeddah 1216 km
- New Jeddah Airport Terminals 1219 km
- Lamezia Terme International Airport 1698 km
- Anambra International Cargo Airport 3692 km
- Airport City 0.7 km
- Cairo International Airport 1.6 km
- Runway 05C/23C 1.6 km
- Sheraton 2.5 km
- New Nozha 2.8 km
- Runway 05R/23L 3.6 km
- Nozha 4 km
- Military Industry 4.2 km
- Heliopolis 5.3 km
- Greater Cairo 5.7 km