It opened in 1968, initially built by Shell and the Gas Council. Planning permission had been given on 16 June 1967 by Anthony Greenwood, Baron Greenwood of Rossendale.
The Leman field began on 13 August 1968 (joint Shell-Esso), and the Hewett field (Phillips Petroleum) began operations in July 1969.
Construction of the £5 million Phillips plant began in April 1968.
The Leman field (Shell-Esso) needed a 34-mile-long pipeline.
A 36-inch diameter 140-mile-long pipe (Number 2 feeder main) costing £17 million was built by Italsider from Bacton to near Rugby.
The Gas Council marketed the new North Sea gas as High Speed Gas.
On 13 August 1981, 11 gas workers lost their lives in the G-ASWI North Sea ditching, in a Wessex helicopter. At 6pm on 28 February 2008, there was an explosion and fire at the Shell UK terminal, for which Shell were fined £1 million
The Leman field began on 13 August 1968 (joint Shell-Esso), and the Hewett field (Phillips Petroleum) began operations in July 1969.
Construction of the £5 million Phillips plant began in April 1968.
The Leman field (Shell-Esso) needed a 34-mile-long pipeline.
A 36-inch diameter 140-mile-long pipe (Number 2 feeder main) costing £17 million was built by Italsider from Bacton to near Rugby.
The Gas Council marketed the new North Sea gas as High Speed Gas.
On 13 August 1981, 11 gas workers lost their lives in the G-ASWI North Sea ditching, in a Wessex helicopter. At 6pm on 28 February 2008, there was an explosion and fire at the Shell UK terminal, for which Shell were fined £1 million
Wikipedia article: http://en.wikipedia.org/wiki/Bacton_Gas_Terminal
Nearby cities:
Coordinates: 52°51'33"N 1°27'38"E
- Zeepipe terminal 211 km
- Anna Paulowna Compressor Station 222 km
- Gas Distribution station 310 km
- Natural gas production site De Paauwen 356 km
- Natural gas production site Ten Post 357 km
- Natural gas production site Overschild 361 km
- Natural gas production site Leermens 362 km
- Natural gas production site Spitsbergen 362 km
- Natural gas production site 369 km
- Natural gas production site 369 km
- tunstead church farm 12 km
- Beeston Park 13 km
- Barton Broad 14 km
- Hoveton Hall - grounds 15 km
- Horsey Mere 17 km
- Former RAF Ludham 17 km
- Hickling Broad 17 km
- Wroxham Broad 18 km
- Martham Broad National Nature Reserve 19 km
- Winterton Dunes National Nature Reserve 21 km