New Railroad Bridge (Belgrade)

Serbia and Montenegro / Central Serbia / Belgrade
 railway bridge, cable-stayed bridge

New Railroad Bridge is a bridge over the Sava river in Belgrade. It is a cable-stayed bridge.
The railroad bridge across the River Sava between the Novi Beograd and Prokop stations is 1928 m long.

The bridge was completed and opened for traffic in 1979. It was the first bridge to use cable-stayed girder system in the railroad industry.

The bridge was designed by Nikola Hajdin, engineer and current president of the Serbian Academy of Sciences and Arts.
Nearby cities:
Coordinates:   44°47'59"N   20°26'9"E
  •  14 km
  •  24 km
  •  34 km
  •  88 km
  •  194 km
  •  201 km
  •  240 km
  •  261 km
  •  312 km
  •  505 km
This article was last modified 5 years ago