 airport terminal, 2010_construction

Terminal 2 is a 75,000 m2 (810,000 sq ft) terminal and pier (pier E) which provides 19 air bridges for aircraft and is capable of handling 15 million passengers annually, thereby allowing the airport to handle 35 million passengers a year. The project was designed by Pascall+Watson architects and the total cost is put at €600 million. Terminal 2 also features the US pre-clearance immigration facility which was previously housed in Terminal 1.
Construction of Terminal 2 began on 1 October 2007, and was officially opened on 19 November 2010 by the then Taoiseach Brian Cowen T.D.