Pulai River Bridge

Malaysia / Johor / Pekan Nenas /

The bridge that shortened the travel time from Johor Bahru District to Pontian District from 1 hour to 1/2 hour was officially opened by Johor Menteri Besar Dato Onn Hafiz Ghazi on 19 January 2023. It costed RM800 million and was constructed by MMC Corporation Berhad. It is 7.5 kilometre two-way two-lane bridge boasted 25 metre high and 100 metre navigation clearance for ship passage. The bridge provide direct access from Tanjung Pelepas, Gelang Patah to Tanjung Bin, Pontian.
Nearby cities:
Coordinates:   1°22'16"N   103°32'2"E
This article was last modified 3 months ago