Mitsubishi Cement Corporation, Cushenbury Plant
USA /
California /
Big Bear City /
SR 18 North Shore Drive, 5808
World
/ USA
/ California
/ Big Bear City
World / United States / California
house, quarry, cement plant, production
5808 CA-18
Lucerne Valley, CA 92356
(760) 248-7373
The Cushenbury plant is the former Kaiser Cement plant, which was purchased by Mitsubishi Cement Corporation in the 1990s. Mitsubishi Cement Co. owns and operates cement operations in Japan, China, and the USA. This mine provides Southern California, Arizona, Nevada and Utah with a consistent and high quality cement product that is used for construction, roofing, and highways. Without companies like Mitsubishi Cement, the cost of everything manufactured from cement would rise dramatically in the local area, since transporting cement long distances can double or triple the cost of the cement product.
www.mitsubishicement.com/
www.mine-engineer.com/mining/mitsubishi-cement.htm
mrdata.usgs.gov/mrds/show-mrds.php?dep_id=10140771
Lucerne Valley, CA 92356
(760) 248-7373
The Cushenbury plant is the former Kaiser Cement plant, which was purchased by Mitsubishi Cement Corporation in the 1990s. Mitsubishi Cement Co. owns and operates cement operations in Japan, China, and the USA. This mine provides Southern California, Arizona, Nevada and Utah with a consistent and high quality cement product that is used for construction, roofing, and highways. Without companies like Mitsubishi Cement, the cost of everything manufactured from cement would rise dramatically in the local area, since transporting cement long distances can double or triple the cost of the cement product.
www.mitsubishicement.com/
www.mine-engineer.com/mining/mitsubishi-cement.htm
mrdata.usgs.gov/mrds/show-mrds.php?dep_id=10140771
Wikipedia article: http://en.wikipedia.org/wiki/Mitsubishi#Mitsubishi_companies
Nearby cities:
Coordinates: 34°21'17"N 116°51'15"W
- Riverside Cement Factory (TXI Company) 53 km
- Mojave Solar Project 87 km
- Solar Energy Generating Systems 8-9 89 km
- Solar Energy Generating Systems III-VII 99 km
- Boron Pit 110 km
- Rio Tinto Borax Mine 114 km
- Palmdale Regional Airport/United States Air Force Plant 42 121 km
- The Ivanpah Solar Electric Generating System 185 km
- Photovoltaic power station 189 km
- Silver State North Solar Project 197 km
- Mammoth Ledges 6 km
- County Dump Site 6.3 km
- Blue Boy Limestone Quarry 7.5 km
- Blackhawk Landslide 8.8 km
- Lucerne Valley, California 12 km
- Quarry 15 km
- Soggy Lakebed Silt Bed 18 km
- Rabbit Lake 19 km
- Lucerne Lake 19 km
- San Bernardino National Forest 34 km
Comments