Century Wind Farm
USA /
Iowa /
Blairsburg /
World
/ USA
/ Iowa
/ Blairsburg
wind farm
Add category
Century Wind Farm is located in a roughly rectangular area stretching about 4 miles east-west and 1-8 miles north of Blairsburg, Iowa. It is actually registered as 3 wind farms, called Century I, Century II and Century III:
• Century I was constructed in 2005 and contains 100 GE Energy 1.5s turbines with a combined nominal capacity of 150 MW.
• Century II was constructed in 2005 and contains 35 Mitsubishi MWT-1000-61 turbines with a combined nominal capacity of 35 MW.
• Century III was completed in 2008 and contains 10 GE Energy 1.5sle turbines with a combined nominal capacity of 15 MW.
In total, these 3 phases of the Century wind farm contain 145 wind turbines with a nameplate capacity of 200 MW.
On the ground, the individual turbines for phases I & III are slightly intermingled with each other in the northeast section of the site. The 35 turbines of Century II are all located in the southernmost section, closest to Blairsburg.
• Century I was constructed in 2005 and contains 100 GE Energy 1.5s turbines with a combined nominal capacity of 150 MW.
• Century II was constructed in 2005 and contains 35 Mitsubishi MWT-1000-61 turbines with a combined nominal capacity of 35 MW.
• Century III was completed in 2008 and contains 10 GE Energy 1.5sle turbines with a combined nominal capacity of 15 MW.
In total, these 3 phases of the Century wind farm contain 145 wind turbines with a nameplate capacity of 200 MW.
On the ground, the individual turbines for phases I & III are slightly intermingled with each other in the northeast section of the site. The 35 turbines of Century II are all located in the southernmost section, closest to Blairsburg.
Nearby cities:
Coordinates: 42°32'34"N 93°39'16"W
- Pleasant Valley Wind Farm 162 km
- Rolling Hills Wind Farm 171 km
- Highland Wind Farm 181 km
- Bishop Hill I Wind Farm 314 km
- Prairie Breeze I Wind Farm 383 km
- Bison Wind Farm 814 km
- Brady I Wind Energy Center 871 km
- Blackspring Ridge Wind Farm 1706 km
- Shepherds Flat Wind Farm 2134 km
- Windy Point/Windy Flats wind farm 2195 km
- Webster City Power Plant 15 km
- Hamilton County Speedway 16 km
- Webster City High School 17 km
- Webster City Municipal Airport 21 km
- Runway 14 / 32 21 km
- Homewood Cemetery 24 km
- Poet Biorefining 24 km
- Park 26 km
- Anderson Goose Lake 26 km
- South Hamilton Middle High School 27 km