LAKU New Water Treatment Plant

Malaysia / Sarawak / Bintulu /
 water supply treatment plant  Add category
 Upload a photo

The Sg Kelalong dam for the Bintulu Water Supply, Stage III project is located about 20km north east of Bintulu on a right tributary of the Sg Sibiu. The dam, which has a reservoir capacity of 33,680ML at the full supply level of El 30.0m comprises the following:

A main dam approximately 30m high and 460m long, a right bank saddle dam of 19m high and 330m long and a left bank cut-off trench extending 410m beyond the main dam incorporating two low saddle dams;
A concrete lined open channel spillway of 25m width in the right bank of the main dam;
An outlet works with a peak release capacity of 307 ML/day (with the reservoir at RL 18.0m) and twice this with the reservoir at FSL.
Nearby cities:
Coordinates:   3°14'56"N   113°11'3"E
This article was last modified 10 years ago