Goldex Shaft 2 (Dubuisson (Val-D'Or))
Canada /
Quebec /
Val-dOr /
Dubuisson (Val-D'Or)
World
/ Canada
/ Quebec
/ Val-dOr
mine, mine shaft, gold mine
Shaft #2, which is a production shaft, was completed in 2007. It has a diameter of 5.5-m with a 50-centimetre thick concrete lining and is used for ventilation as well as hoisting services. Shaft #2 is 865 metres deep and includes five stations. A refurbished friction hoist was installed for production and service duties, and an auxiliary hoist was installed for emergency and personnel service. The production hoist is equipped with one cage-skip. Each skip has a 21.5-tonne capacity and the shaft can hoist an average of 7,000 to 8,000 tonnes of ore per day.
Nearby cities:
Coordinates: 48°5'30"N 77°51'46"W
- East Mine 193 km
- West Mine 196 km
- Copper Rand Mine 330 km
- Erie Forge & Steel Inc. 689 km
- Ellwood National Forge 704 km
- Shaft 3 1190 km
- Lalor Production Shaft 1710 km
- Goldstrike Mine - Meikle Underground 3121 km
- Goldstrike Mine - Rodeo Underground 3121 km
- Turquoise Ridge Mine Shafts 3174 km
- Val-d’Or Regional Airport (ARVO) (YVO/CYVO) 7 km
- Sigma Lamaque Property 8 km
- Tailings Storage Facility 8.6 km
- Lamaque Property 8.9 km
- Lac DeMontigny 11 km
- Bourlamaque Lake 11 km
- East Sullivan Mines 12 km
- Lac Langis 13 km
- Lac Herbin Property 17 km
- Lac Sabourin 19 km