Cedar Point Wind Farm Electrical Substation
USA /
Colorado /
Limon /
World
/ USA
/ Colorado
/ Limon
electrical substation
Add category
This substation collects power from the Cedar Point Wind Farm.
Cedar Point Wind Farm was completed in 2011 and consists of 139 Vestas wind turbines that are each capable of generating 1.8 megawatts. The wind farm is located in Arapahoe, Elbert and Lincoln counties.
www.enbridgeus.com/Delivering-Energy/Renewable-Energy/W...
Cedar Point Wind Farm was completed in 2011 and consists of 139 Vestas wind turbines that are each capable of generating 1.8 megawatts. The wind farm is located in Arapahoe, Elbert and Lincoln counties.
www.enbridgeus.com/Delivering-Energy/Renewable-Energy/W...
Nearby cities:
Coordinates: 39°26'55"N 103°40'45"W
- Electrical substation 40 km
- Golden West Substation 82 km
- Fort Lupton Substation 119 km
- Electrical sub-station 120 km
- Outdoor switchgear TPP 127 km
- Midway Electric Power Substation 132 km
- Electrical Substation 146 km
- Front Range Energy 151 km
- Comanche Electrical Substation 158 km
- Electrical substation 161 km
- Cedar Point Wind Farm 0.2 km
- Limon I & II Wind Farms 10 km
- Agate, Colorado 23 km
- Limon Correctional Facility 26 km
- Limon III Wind Farm 27 km
- Clean Harbor environmental 34 km
- High Plains Raceway 37 km
- Speakers Oil Field 71 km
- Cope, Colorado 75 km
- Joes, Colorado 89 km