Designed to transmit power from Units 3 and 4 of the Chernobyl Nuclear Power Plant to the power grid. Connected to the 330 kV outdoor switchyard via two 750/330 kV autotransformers. Turbogenerators Nos. 5–8 of Units 3 and 4 were connected to the switchyard through two 750/20 kV block transformers, one serving two generators belonging to a single unit.

Connected to the power grid via two 750 kV overhead transmission lines:
750 kV overhead line Chernobyl NPP — Kyiv substation
750 kV overhead line Chernobyl NPP — Khmelnytskyi NPP