750 kV Switchyard
Ukraine /
Kyyivska /
Prypyat /
World
/ Ukraine
/ Kyyivska
/ Prypyat
, 1 km from center (Припьять)
outdoor switchgear
Add category
Designed to transmit power from Units 3 and 4 of the Chernobyl Nuclear Power Plant to the power grid. Connected to the 330 kV outdoor switchyard via two 750/330 kV autotransformers. Turbogenerators Nos. 5–8 of Units 3 and 4 were connected to the switchyard through two 750/20 kV block transformers, one serving two generators belonging to a single unit.
Connected to the power grid via two 750 kV overhead transmission lines:
750 kV overhead line Chernobyl NPP — Kyiv substation
750 kV overhead line Chernobyl NPP — Khmelnytskyi NPP
Connected to the power grid via two 750 kV overhead transmission lines:
750 kV overhead line Chernobyl NPP — Kyiv substation
750 kV overhead line Chernobyl NPP — Khmelnytskyi NPP
Nearby cities:
Coordinates: 51°22'58"N 30°5'49"E
- Idle electrical substation 0.5 km
- 330 kV Distribution substation Chernobyl 0.5 km
- High voltage switchgear. 271 km
- Open switchgear Lukoml State District Power Plant 373 km
- ОРУ 500/750 кВ 375 km
- ОРУ 330 кВ 376 km
- Outdoor switch-yard 330 kV 471 km
- ОРУ 750 кВ 471 km
- 110/330 kV distribution system 525 km
- Kruonis switchyard 545 km
- Outdoor Switchyards of the Chernobyl NPP 0.2 km
- Chornobyl Nuclear Power Plant 1.3 km
- Khutir Pidlisnyi (Khutir Yaniv) (former village) 2.2 km
- Lake Azbuchin 2.5 km
- The Red Forest 2.7 km
- 330 kV transmission line 2.7 km
- Swamp 2.9 km
- Yanіv 3.2 km
- II Microdistrict 3.5 km
- Chornobyl Exclusion Zone 15 km
Comments