Los Alamos National Laboratory TA-55

USA / New Mexico / Los Alamos /
 laboratories  Add category
 Upload a photo

Here inside the double fenced TA-55 (Plutonium Facility Site) LANL provides chemical and metallurgical processes for recovering, purifying and converting plutonium. In addition, analytical capabilities, materials control, accountability techniques and a substantial R&D base are available here.
The Plutonium Facility Site at TA-55 is located on 40 acres (16.18 ha) about 1 mi (1.6 km) southeast of the central technical area (TA-3). Most of TA-55 is situated inside a restricted area surrounded by a double security fence. The main complex has five connected buildings: the Administration Building (Building 1), the Support Office Building (Building 2), the Support Building (Building 3), the Plutonium Facility (Building 4), and the Warehouse (Building 5). The Nuclear Materials Storage Facility (Building 41) is separate from the main complex but shares an underground transfer tunnel with Building 4. Various support, storage, security, and training structures are located throughout the main complex.
TA-55 provides chemical and metallurgical processes for recovering, purifying, and converting plutonium and other actinides into many compounds and forms. Additional capabilities include the means to safely and securely ship, receive, handle, and store nuclear materials, as well as manage the wastes and residues produced by TA-55 operations. A core capability is basic and applied research in plutonium and actinide chemistry.
Extensive plutonium recovery processes are maintained, as well as the ability to convert the recovered material to plutonium metal. A separate portion of the facility is dedicated to fabricating ceramic-based reactor fuels and to processing 238Pu used to produce radioisotope heat sources. In addition, analytical capabilities, materials control and accountability techniques, and a substantial R&D base are available to support these core capabilities.
A sophisticated nuclear materials measurement and accountability system is used at TA-55. The system includes nuclear materials accounting, nuclear materials management and modeling, a measurement support operation, operation of a nondestructive assay laboratory, nuclear materials packaging and transfer, and nuclear materials storage. All nuclear materials that are in process or are stored on-site are monitored to ensure that material balances are properly maintained and inventoried on a real-time basis. The nuclear-materials-packaging and transfer operation receives nuclear material into the facility and transfers shipments out of the facility. The nuclear materials storage operation provides a safe storage location for the actinide materials at the Plutonium Facility.
The Plutonium Facility has extensive capabilities for treating, packaging, storing, and transporting the radioactive waste produced by TA-55 operations. Liquid wastes are converted to solids or are piped to the RLWTF at TA-50. Some solid TRU wastes are immobilized in cement in 55-gal. (208-L) drums. Other TRU waste is consolidated in 15-gal. (57-L) or 30-gal. (114-L) drums or is packaged in waste boxes. Low-level wastes are also packaged at this facility. Solid wastes of all types are stored at TA-55 until they are shipped to Laboratory waste storage or disposal locations, primarily at TA-54.
Plutonium-239 is stored for small production of nuclear weapon cores as well as Plutonium-238 is handheld here for production of RTGs (Radioisotope Thermoelectric Generators) for nuclear powered space crafts. Viking and Voyager RTGs were constructed here for instance.
Nearby cities:
Coordinates:   35°51'45"N   106°18'8"W
This article was last modified 7 years ago