Crystal Rig Wind Farm Phases 2 & 2a
United Kingdom /
Scotland /
West Barns /
World
/ United Kingdom
/ Scotland
/ West Barns
World / United Kingdom / Scotland
wind farm
Add category
Crystal Rig Phases 2 & 2a were both completed in September 2010 and consist of 60 Siemens SWT-2.3 turbines in total capable of producing 138 MW. This supplements the output capacity of the overall Crystal Rig wind farm to 200.5MW. Phases 2 and 2a have a dedicated grid substation to connect into the 400kV national grid transmission line which passes through the eastern side of this phase of the wind farm.
The original phase 1 and 1a comprised 25 Nordex N80 turbines (62.5MW).
A third phase of 9 or 18 turbines is currently (2011) being considered.
The original phase 1 and 1a comprised 25 Nordex N80 turbines (62.5MW).
A third phase of 9 or 18 turbines is currently (2011) being considered.
Wikipedia article: http://en.wikipedia.org/wiki/Crystal_Rig_Wind_Farm
Nearby cities:
Coordinates: 55°54'22"N 2°33'20"W
- Clyde Wind Farm 80 km
- Griffin Wind Farm 108 km
- Whitelee Wind Farm 115 km
- Hadyard Hill Wind Farm 158 km
- Methlick Farmers Wind Farm 170 km
- Arecleoch Wind Farm 173 km
- Burbo Wind Farm 269 km
- North Hoyle Offshore Wind Farm 281 km
- Rhyl Flats Wind Farm 291 km
- Boggeragh Mountains (An Bhograch) 601 km
- East Lothian Council 11 km
- John Muir Country Park 12 km
- Abbey St Bathans 12 km
- RAF East Fortune Airfield 15 km
- Garleton Hills 16 km
- North Berwick 19 km
- West Blanerne Farm 20 km
- RAF Drem 20 km
- Scottish Borders 45 km
- Fife Council 52 km