Under-construction residential complex D8 (Moscow) | construction site

Russia / Moscow / Moscow / Danilovskaya naberezhnaya
 construction site  Add category

Multifunctional district on the site of the Danilovsky Construction Plant

After public hearings in 2023, the territory of the Danilovsky Construction Plant was allocated for redevelopment.

The tallest building will be 225 meters high.
Developer: LLC «Glavstroy».
History of the plant

1893: Founded by private owner Ptitsyn as the Danilovsky Alabaster Plant, producing construction gypsum.
1917: Nationalized and incorporated into «Mossilikat.»
1939: Came under the jurisdiction of the Mossovet (Moscow Council).
World War II: Produced goods essential for the country’s defense.
Postwar era: Focused on construction and medical gypsum production. In 1957, began manufacturing gypsum fiber partition panels.
1960: Started producing prefabricated sanitary units for housing construction. Approximately 700,000 units were delivered to construction sites in Moscow.
1966: Renamed the Danilovsky Cabin Manufacturing Plant.
1993: Became an open joint-stock company.
1998: Operated as a public joint-stock company.
www.novostroy-m.ru/baza/jk_danilovskaya_naberejnaya_8
Nearby cities:
Coordinates:   55°42'34"N   37°38'8"E
This article was last modified 4 months ago