Crystal Rig Wind Farm Phases 1 & 1a

United Kingdom / Scotland / Dunbar /
 wind farm  Add category
 Upload a photo

Crystal Rig Wind Farm - Phase 1 and 1a - 25 Turbines, total output 62.5MW
The initial phase was completed in May 2004 and consisted of 20 Nordex N80 turbines producing a maximum of 50 MW. Phase 1a was completed in 2007 by adding a further 5 Nordex N80 turbines.

The wind farm has subsequently been extended.