Ergo Gold Project (Brakpan Tailings)
South Africa /
Gauteng /
Brakpan /
World
/ South Africa
/ Gauteng
/ Brakpan
World / South Africa / Gauteng
mining, tailings
This is the Brakpan tailings deposition site which is part of DRDGold's Ergo gold recovery project called Ergo. (ErgoGold). The quartzite rock is ground to fine sand and powder, deadly sodium cyanide is used to extract the gold, and the toxic waste sand is pumped to these great piles. The "lake" in the middle can be hazardous for years after mining has stopped.
Reference for information:
www.drd.co.za/b/ergo.asp
Reference for information:
www.drd.co.za/b/ergo.asp
Nearby cities:
Coordinates: 26°21'25"S 28°18'44"E
- Nigel Gold Mine 15 km
- Consolidated Modderfontein Gold Mine 21 km
- Evander Gold Mine 55 km
- Booysendal Platinum Mine 222 km
- Tamboti Platinum Project 237 km
- Modikwa Platinum Mine 269 km
- Twickenham Platinum Mine 274 km
- Mogalakwena Platinum Mine 277 km
- Bokoni Platinum Mine 277 km
- Ga-Phasha Platinum Mine 279 km
- ERPM Extension 6.1 km
- Langaville 8.4 km
- Sub Nigel-Spaarwater Gold Mine 8.6 km
- Duduza 10 km
- DUNNOTTAR 12 km
- Selcourt 14 km
- Consolidated Modderfontein Gold Mine 14 km
- Selection Park 16 km
- Nigel Gold Mine 18 km
- Grootvlei Proprietary Gold Mine 21 km
Comments