Bongaigaon Thermal Power Plant

India / Assam / Basugaon /
 power plant, thermal power station

of National Thermal Power Corporation of India, Plant at Salakati (sālakāṭi)
Bongaigaon Thermal Power Station was the biggest plant situated at Salakati in the district of Kokrajhar in Assam. It consisted of four coal-fired units of 60 MW each. These units came into operation during the year 1981 to 1986 in two stages. In the first stage, two units (Unit I & II) were commissioned in 1981 and 1982 respectively. In the second stage, two units (Unit-III & IV) were commissioned in 1985 and 1986 respectively.

Major equipment like boiler, turbine, auxiliaries like BFP, CEP, PA fans, bowl mills etc. were supplied by BHEL. In coal handling plant, major equipment like primary and secondary crusher were supplied by TRF and wagon trippler was supplied by Heavy Engineering Corporation (HEC). Since commissioning none of the unit could deliver the desired level of generation for various reasons. Some of the main reasons were problem in the boiler, turbine, mill and other unit auxiliaries and also in the coal handling plant. During July 2002, the plant was running at a very low PLF of 4.6%, very high auxiliary power consumption of 22.68% very high specific oil consumption of 59.12 ml/kwhr and height specific coal consumption of 0.85 kg/kwhr with a coal of GCV 3500 Kcal/kg. None of the units could deliver the required level of generation and the maximum PLF of the plant in the last twenty years of operation has been only 24.23%. As a result, the station had to be shut down. It had been found that although it was technically feasible to renovate the existing units of BTPS, it would not have been economically viable as the tariff works out to about Rs 3.16 per unit after carrying out R&M at an estimated cost of about Rs 7 billion. Hence, capital grant/viability gap funding of Rs 3.5 billion would have to be provided to bring down the tariff to an acceptable level of Rs 2.50 per unit. The alternative is NTPC's proposal to set up a new 750 MW (3 X 250 MW) Thermal Power Station at the same location, at a total project cost of approximately Rs Rs 44.9624 billion based on third quarter 2006 price level. The power station would be based on Fuel Gas Desulphurization (FGD) technology due to high sulphur content of Assam coal, involving additional cost of Rs 0.5 crores/MW approximately.
So, it appears that till 2015 the the plant was still in a Project Stage and later in 2015

23 Jun, 2015: Bharat Heavy Electricals Limited (BHEL) - a State-run equipment maker has commissioned a 250 MW the first unit of NTPC's Bongaigaon thermal power plant

The full 750 MW is planned to be completed in 2017
Nearby cities:
Coordinates:   26°26'38"N   90°21'52"E

Comments

This article was last modified 8 years ago