East Spar gas and condensate field

Australia / Western Australia / Karratha /
 gas field  Add category
 Upload a photo

Discovered 1n 1993 and production started 1996. Gas is piped 63 km to Varanus island processing facility, condensate is separated and stored. Gas is sent to mainland WA via two 100 km pipeline that connects to the Bunbury and Goldfield Transmission trunks.
operator: Apache
partner: Santos
Nearby cities:
Coordinates:   20°31'45"S   114°56'8"E
This article was last modified 2 years ago