open-pit mine, iron mine

Location: 110km from Newman, West Australia.
Operation: Open pit operation with site-based processing facilities.
Working arrangements: Fly-in / fly-out roster.
Capacity: 29.5 million tonnes total railout per annum
Products: Pilbara Blend Lump and Fines.
Geology: Marra Mamba Bedded Iron Deposit.
First year of operation: 2002
Ownership: West Angelas is owned by Robe River Iron Associates of which Rio Tinto has a 53 percent operating interest.
Assets Mobile fleet:
• 14 x 730E Komatsu (190t) haul trucks.
• 24 x 830E Komatsu (220t) hul trucks.
• 9 x loading units (3 excavators, 2 shovels, 4 front end loaders).
• 5 x track dozers (3 x D11, 2 x D10).
• 2 x wheel dozers.
• 3 x motor graders (2 x 16M, 1 x 24H).
• 4 x dump truck water carts.
• 6 x large dia blast hole rigs and 1 smaller specialist wall control drill rig.
• 2 x MMU explosive pump trucks
Autonomous haul system fleet:
• 5 x Komatsu 930E haul trucks.
• 1 x Komatsu 5500 excavator.
• 1 x Komatsu track dozer.
• 1 x Komatsu wheel dozer.
• 1 x Komatsu motor grader.
• 1 x water cart.
Crushing and screening plant.
Train loadout capability.
Relaimer and stacker.
(Information as of Dec 2010)
Operation: Open pit operation with site-based processing facilities.
Working arrangements: Fly-in / fly-out roster.
Capacity: 29.5 million tonnes total railout per annum
Products: Pilbara Blend Lump and Fines.
Geology: Marra Mamba Bedded Iron Deposit.
First year of operation: 2002
Ownership: West Angelas is owned by Robe River Iron Associates of which Rio Tinto has a 53 percent operating interest.
Assets Mobile fleet:
• 14 x 730E Komatsu (190t) haul trucks.
• 24 x 830E Komatsu (220t) hul trucks.
• 9 x loading units (3 excavators, 2 shovels, 4 front end loaders).
• 5 x track dozers (3 x D11, 2 x D10).
• 2 x wheel dozers.
• 3 x motor graders (2 x 16M, 1 x 24H).
• 4 x dump truck water carts.
• 6 x large dia blast hole rigs and 1 smaller specialist wall control drill rig.
• 2 x MMU explosive pump trucks
Autonomous haul system fleet:
• 5 x Komatsu 930E haul trucks.
• 1 x Komatsu 5500 excavator.
• 1 x Komatsu track dozer.
• 1 x Komatsu wheel dozer.
• 1 x Komatsu motor grader.
• 1 x water cart.
Crushing and screening plant.
Train loadout capability.
Relaimer and stacker.
(Information as of Dec 2010)
Wikipedia article: http://en.wikipedia.org/wiki/West_Angelas_mine
Nearby cities:
Coordinates: 23°10'57"S 118°46'37"E
- Koodaideri iron ore mine project 83 km
- Brockman No 4 Iron Ore Mine 180 km
- Iron Hill 6207 km
- Iron Ore Mine Sangan Complex 8906 km
- Iron Ore Mine Gol Gohar Complex 8958 km
- Anglo American Kolomela Mine 9365 km
- Gara Djebilet 14635 km
- U.S. Steel Mountain Iron Mine (Minntac) 16138 km
- Silver Yard, Labrador Iron Ore mines 16472 km
- Wawa Sulphur Kill 16560 km
- Mining Area C (a.k.a. MAC/Marra Mamba C) 33 km
- Hope Downs Iron Ore Mine 42 km
- Yandi Iron Ore Mine 57 km
- Yandicoogina Iron Ore Mine 64 km
- Koodaideri iron ore mine project 79 km
- Mt Whaleback Mine Site (BHP Billiton Iron ore mine) 94 km
- Fortescue Marsh 115 km
- Cloudbreak ore mine 116 km
- Christmas Creek ore mine 136 km
- Roy Hill Mine 143 km