Line: Santo Antônio Hydroelectric Plant / Porto Velho RO Converter Substation to Araraquara II Substation.
Operator: Interligação Elétrica do Madeira S.A.
Distribution: NBTE - Norte Brasil Transmissora de Energia.
Distance: 3,452 km
Transmission Power: 600 kW Bipole
Operator: Interligação Elétrica do Madeira S.A.
Distribution: NBTE - Norte Brasil Transmissora de Energia.
Distance: 3,452 km
Transmission Power: 600 kW Bipole