Terminal 1
USA /
California /
San Diego /
World
/ USA
/ California
/ San Diego
airport terminal, 2025_construction
San Diego International Airport's Terminal 1. The building opened on September 22, 2025 with 19 gates. It replaced the original Terminal 1 building constructed in the 1960s. The project is being implemented in phases, with a second expansion opening in 2028 with an additional 11 gates.
Nearby cities:
Coordinates: 32°43'53"N 117°11'33"W
- Shively Field (SAA/KSAA) 1334 km
- Riverton Municipal Airport (RIW/KRIW) 1381 km
- Worland Municipal Airport (WRL/KWRL) 1487 km
- Portland International Airport Terminal 1505 km
- SeaTac Airport Main Terminal 1694 km
- Sugar Land Regional Airport (KSGR) 2076 km
- Airport terminal 2313 km
- Terminal 1 - Benito Juarez International Airport 2331 km
- Terminal 1 - Lindbergh 2466 km
- Louis Armstrong New Orleans International Airport-North Terminals (Under Construction) 2571 km
- San Diego International Airport (SAN/KSAN) 0.3 km
- Runway 9/27 0.4 km
- Sheraton San Diego Resort 0.9 km
- Harbor Island 1 km
- United States Coast Guard Activities San Diego 1.1 km
- Midway-Pacific Highway Corridor 1.5 km
- Mission Hills 1.9 km
- HELSEACOMBATRON 3 Flightline 2.4 km
- Naval Air Station North Island 3.7 km
- San Diego Bay 7.8 km