The Bash 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.
ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.
The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.
Nearby cities:
Coordinates: 40°39'43"N 64°40'7"E
- Dhzyngyldy 500 MW Wind Park Project 118 km
- Wind turbine 1284 km
- Wind turbine 1285 km
- Wind turbine 1285 km
- Wind turbine 1285 km
- Wind turbine 1285 km
- Wind turbine 1285 km
- Tabriz Wind turbines 1601 km
- Wind turbine 1799 km
- Wind turbine 1799 km
- Ayakagytma Lake 12 km
- Vabkent cotton ginnery factory 74 km
- Mount Quljuqtau 75 km
- Bukhara Oasis 82 km
- abandoned railway station 89 km
- Rometan Tepa 90 km
- Kara-Kyr Hill 108 km
- Golovnye 114 km
- Bel-Tau Mountain 117 km
- Katlavan 121 km
Comments