Bash 500 MW Wind Park Project

Uzbekistan / Buxoro / Shofirkon /
 wind turbine  Add category
 Upload a photo

The Bash 500 MW Wind Farm is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan.

ACWA Power and the JSC National Electrical Grid of Uzbekistan signed a 25-year Power Purchase Agreement (PPA) for the development/construction/operation of a 500 MW onshore wind power plant. JSC National Electric Grid of Uzbekistan acts as the sole off-taker.

The project will be located in the Bukhara region and will be developed as a ‘Build, Own, Operate, Transfer’ project. ACWA Power will take the lead in the construction, engineering, operation and maintenance the plant.
Nearby cities:
Coordinates:   40°39'43"N   64°40'7"E

Comments

  • We will delivery all OOG for this project. www.sarens.kz
  •  68 km
  •  197 km
  •  210 km
  •  215 km
  •  482 km
  •  640 km
  •  658 km
  •  729 km
  •  780 km
  •  991 km
This article was last modified 3 years ago